| 【Case of Substation Explosion Venting and Sound Absorbing Wall】Nanchang Wannan 110kV Substation + Nanchang Yingbin 220KV Substation |
| Date: 2026-01-09 Views: 15 |
|
【Case of Substation Explosion Venting and Sound Absorbing Wall】Nanchang Wannan 110kV Substation + Nanchang Yingbin 220KV Substation Project Background With the expansion of Nanchang's urban scale, Wannan Substation and Yingbin Substation are facing the following core issues: 1. Safety hazards: The operational pressure on the aging substation equipment has increased, posing a potential explosion risk, and it is necessary to meet the requirements of the "Code for Seismic Design of Electric Power Facilities". 2. Noise pollution: The substations are adjacent to residential areas, and the noise from the main transformers affects the normal life of residents. 3. Low-carbon transformation: Nanchang's "14th Five-Year Plan" clearly requires that infrastructure projects adopt green building materials to realize resource recycling. In response to the above pain points, Yuanyang Weili has achieved a dual breakthrough in the functions of "explosion venting and pressure relief + sound absorption and noise reduction" for substations through innovative technologies in terms of product production, in-depth design, and engineering construction, setting a new benchmark for urban infrastructure! Nanchang Wannan 110kV Substation Project Name: Nanchang Wannan 110kV Substation
Nanchang Yingbin 220KV Substation Project Name: Nanchang Yingbin 220kV Substation ![]()
|
Ocean Willie official public number
YUANYANG WEILI